Raceway Derating Explained (Rule 4-008)
When multiple current-carrying conductors share a raceway or cable without maintaining spacing, ampacity must be reduced per Rule 4-008 and Table 5C. The conductor sizing calculator applies derating alongside conduit fill.
See also the ampacity and derating guide and conduit fill guide.